Gallery

In this photo we fit a laminate covering to the first floor, meticulous attention was taken with the mouldings round the newel post to mitre the angles correctly.

 

 

 

 

 

 

 

After the water ingress was stoped the RSJ was boarded over and skimmed.

 

 

 

 

 

 

The top three photos are a patio and wall we did in Skipton, the wall was built using the origional crazy paving  and set out to fit the new stone paving slabs.

The next three are a garden water feature and LED lighting for a customer in Colne

Safe Trader ScemeLogo

We are proud to be a member of the Safe Trader Scheme, for which we won a Trader excellence award for positive feed back for 2012, 2013 and now 2014.

Test Equipmentfluke_1653

Our test equipment is caliberated anually to conform with Part P

Elecsa_logo

To fulfill our Part P obligations we are proud to be regesterd with Elecsa for self certification.